RGTCT –Tripper
Description: New Tripper Brief: This project was to replace the existing overhead gantry trippers with new ones. Each tripper is around 45 tonnes and has a 3 way transfer system, retractable discharge chutes, hydraulically actuated stairs, drives systems and davit crane. Our involvement was to produce a preliminary design and model of the new tripper. […]
Ship Loader – Drag Chain\Slip Rings
Description: Ship Loader Loading Chute – Drag Chain \ Slip Rings Brief: This project was to replace the existing connection between the rotating loading chute and the telescopic chute on the boom of the ship loader for the electrical and communication cables. The design had to initially have a drag chain system, but had to […]
Barney Point Coal Terminal – High Wind Barrier Fence
Description: High Wind Barrier Fence Brief: As a serious commitment to the community our client proposed to build a large wind barrier along the edge of their site, this is one of many measures to mange emissions from the site. Our involvement was to produce a model of the proposed structure to help communicate with […]
Jack-Up Barge Access Tower
Brief: Our client needed to safely and efficiently transfer operational staff from a crew boat to a large jack-up barge. Our involvement was to take their initial idea and make it work. The design involved a large tower structure, and a travelling dock. The dock was fitted with a specially design descent control device that […]