Description: New Tripper Brief: This project was to replace the existing overhead gantry trippers with new ones. Each tripper is around 45 tonnes and has a 3 way transfer system, retractable discharge chutes, hydraulically actuated stairs, drives systems and davit crane. Our involvement was to produce a preliminary design and model of the new tripper. Design drawings were then used to do weight and strength analysis as well as interface with the equipment manufacturers.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed