Brief: Our client needed to safely and efficiently transfer operational staff from a crew boat to a large jack-up barge. Our involvement was to take their initial idea and make it work. The design involved a large tower structure, and a travelling dock. The dock was fitted with a specially design descent control device that would allow rapid up travel but controlled descent. All components were design, engineered and detailed by us.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed